QT8-15
Availability: | |
---|---|
Quantity: | |
1. Raw material
(1): use wheelloader(2) delivery into batching machine (5), need 1 worker
b. Cement delivery into mixer (6), from cement silo (3) by cement screw conveyor (4)
c. Mixer (6) ixing material, then delivery to brick machine (9) by conveyor (7); here need 1 worker
d. After produce blocks, block receiver (10), delivery blocks to stacker (11)
e. Forklift (12) delivery blocks to curing area (13), need 1 worker
f. Curing area (13): Curing need 10-15 days, then take blocks out from pallet; need 1-2 workers
g. After curing, take blocks out from pallet, pallet delivery to Pallet feeding machine (8) by forklift (12)
Blocks laying in block stock area
h. Sell blocks: Sell blocks and management; 1 worker
Total need about 5-6 workers in QT8-15 automatic interlocking block machine factory.
2. QT8-15 Hydraulic Automatic Block Production line
(1) QT8-15 automatic brick production line introduce
A | QT8-15 Host brick machine |
B | Block receiver |
C | Stacker, it could layer 4-5 pallets blocks |
D | 8m conveyor |
E | JS750 Mixer bigger power, 38.6KW |
F | Batching machine PLD 800, power, 9KW |
Color feeder system | QT8-15 Color feeder machine--Automatic hydraulic machine |
Color mixer--1.5m; 11kw | |
6m conveyor |
(2) QT8-15 Automatic brick plant technical information:
QT8-15 Host machine total power | 44.2KW |
Molding cycle | 15s |
Vibration frequency | 2500-4000HZ |
Vibration force | 80-100KN |
Host brick machine size | 5300*1700*2700 |
Weight | 7200KGS |
Pallet size | 960*850mm |
3. QT8-15 block machine production capacity show:
Block and Paving Brick Design for your reference:
1. Raw material
(1): use wheelloader(2) delivery into batching machine (5), need 1 worker
b. Cement delivery into mixer (6), from cement silo (3) by cement screw conveyor (4)
c. Mixer (6) ixing material, then delivery to brick machine (9) by conveyor (7); here need 1 worker
d. After produce blocks, block receiver (10), delivery blocks to stacker (11)
e. Forklift (12) delivery blocks to curing area (13), need 1 worker
f. Curing area (13): Curing need 10-15 days, then take blocks out from pallet; need 1-2 workers
g. After curing, take blocks out from pallet, pallet delivery to Pallet feeding machine (8) by forklift (12)
Blocks laying in block stock area
h. Sell blocks: Sell blocks and management; 1 worker
Total need about 5-6 workers in QT8-15 automatic interlocking block machine factory.
2. QT8-15 Hydraulic Automatic Block Production line
(1) QT8-15 automatic brick production line introduce
A | QT8-15 Host brick machine |
B | Block receiver |
C | Stacker, it could layer 4-5 pallets blocks |
D | 8m conveyor |
E | JS750 Mixer bigger power, 38.6KW |
F | Batching machine PLD 800, power, 9KW |
Color feeder system | QT8-15 Color feeder machine--Automatic hydraulic machine |
Color mixer--1.5m; 11kw | |
6m conveyor |
(2) QT8-15 Automatic brick plant technical information:
QT8-15 Host machine total power | 44.2KW |
Molding cycle | 15s |
Vibration frequency | 2500-4000HZ |
Vibration force | 80-100KN |
Host brick machine size | 5300*1700*2700 |
Weight | 7200KGS |
Pallet size | 960*850mm |
3. QT8-15 block machine production capacity show:
Block and Paving Brick Design for your reference:
For more machine details please feel free contact us.
Carey
Whatsapp:+86 16 6957 3883
For more machine details please feel free contact us.
Carey
Whatsapp:+86 16 6957 3883